Certified as a Project Management Professional; motivated, skilled, result oriented and diligent with 07 years of experience working with diverse departments. Now looking to secure a challenging and rewarding new role in the industry, where skills, knowledge, and expertise gained throughout the previous experience in the Project management can be transferred across and utilized to best effect for the benefit of any organization.
Last Resume Update | December 12, 2019 |
Address | Rawalpindi, Pakistan |
[email protected] | |
Phone Number | 03345404070 |
Experience
Project Manager
OVS (Online Verification System) Project (Phase-IV)
• Successfully designed charter under the supervision of the Director.
• Established a feasible and realistic Scope, Schedule & Cost baseline based on input from the team.
• Directed & managed the project’s work and achieved the desired scope in stipulated time & cost.
• Project status & forecast reporting, to concern stakeholders, team, consumers & sponsor.
• Worked with the procurement department to design SOW, selected vendor and get the work done within the finalized contract.
• Identified potential Risks, developed a practical risk response plan and implemented risk response strategies when deemed appropriate.
• Documented project outcome, obtained formal approval of deliverables, designed standard operating procedure (SOP) and user manual for OVS project.
Procurement Manager
• Prepared Technical proposals / quotations.
• Attended Bidders Conference.
• Won the bid for 30 km Gas pipeline in Murree from SNGPL, Pakistan.
• Won the bid, for supply and installation of 30 x Desktops computer at State Life Insurance, Mirpur AJK.
• Procured & distribution of VOOX DD beauty cream.
Assistant Project Manager
OVS (Online Verification System) Project (Phase-III)
• Worked directly with Deputy Director to help implement project goals.
• Assigned duties to team members as per their role and obtained timely feedback on assigned responsibilities.
• Liaise with Sponsor, Vendor and team members to maintain project timelines.
• Researched information and provided suggestions as desired by Deputy Director.
• Scheduled meeting with Sponsor, team & Vendors and recorded meeting minutes.
• Prepared and delivered presentations about the project.
Network/System Engineer
OVS (Online Verification System) Project (Phase-I & Phase-II)
• Designed and deployed Datacenter as required by the project.
• Hosted websites on WAMP, Xamp and IIS web Server.
• Installed & Configured ESxi, Vmware, SNMP and NLB.
• Installed & Configured routers, switches and Firewalls
• Provided L1, L2 & L3 support as required to the stakeholders.
• Provided Hardware support (Laptop, Desktop, Printers & Servers)
System Support Engineer
IESCO HELPLINE (118) Project, Wi-tribe customer support Project
• Installed & Configured routers, switches and Firewalls.
• Provided L1 & L2 support as required to the stakeholders.
• Installed Web servers and operating systems (Linux & Windows).
• Provided Hardware support (Laptop, Desktop, Printers and Servers).
Office Administrative Assistant
• Assisted technical manager in day to day tasks.
• Provided L1 support to customers.
• Managed and maintained office documentation (SLA’s, invoices and Complaint book)
Education
BS (Telecom & Networking)
HSSC (Pre-Engineering)
SSC (Science)