
Assistant Manager (PM & Planning)
Assistant Manager (Preventive Maintenance)
Bestway Cement Limited,Farooqia Haripur, KPK
- Planning of shutdown jobs in accordance with established priorities.
- Perform physical inspection of Equipment in Raw Mill & Utility area in accordance with approved programs / shutdown schedule
- After inspection generation of work orders to concerned departments for remedial action to rectify the problem & to increase reliability of plant through smooth operation.
- Replacement of Roller Tires, Mechanical Seals and Rod Head Bearing
- Replacement of Hydraulic Cylinder
- Replacement and Maintenance of Rotary Feeder
- Installation of Rubber belts
- To supervise the routine /daily maintenance activities of Raw Mill area of the Plant.
Assistant Manager (Planning)
- Worked as a planning Engineer in the same capacity and arranged spares for smooth operation of Cement Mills LM 48.2+2
- Procurement of Belt Conveyors, Roller Tires, Table Liners, Hydraulic valves, Pumps, Bearings, Sealing sets for Rollers and buckets for bucket elevators
Trainee Engineer (Project Planning)
Bestway Cement Limited, 6000 TPD New Line Farooqia Haripur, KPK
- Completed project documentation, which was created, updated and distributed to all appropriate personnel.
- Conducted research to test and analyze feasibility, design, operation and performance of equipment, components and systems.
- Tested new products to resolve and identify any issues.
- Obtained quotes for project materials and communicated with suppliers to determine best pricing.
- Handled administrative tasks such as answering phones, replying to emails, ordering materials, and keeping work space clean and organized.
- Devised and implemented updates and resolutions for handling risks, maintaining compliance and improving designs.
- Evaluated finished assemblies for compliance with standard procedures and design requirement
- Procurement of MS Material and various other items to meet the requirements of the project especially for embedded parts.
- Arrangement of vendors for third party inspection of welding joints of kiln Pre-Heater during project.
Last Resume Update | December 2, 2020 |
Address | Gujrat, Pakistan |
[email protected] | |
Phone Number | 0324-6949673 |