
Seeking for an appropriate position in an organization where my qualification and work experience can be lucratively utilized towards its development. A fast pace learner, dedicated and self-motivated team player with leadership experience who demonstrates excellence in problem solving and time management.
Last Resume Update | March 28, 2019 |
Address | Lahore, Pakistan |
[email protected] | |
Phone Number | 03450536263 |
Experience
Assistant Inspection & Quality Control Engineer (Switchgears)
1. Completed routine and type testing of LT and HT panels.
2. Prepared quality control procedure reports for LT and HT panels.
3. Checked incoming and in-process inspection of materials and procedures during production of panels.
4. Managed customer inspection of panels.
Electrical Site Engineer
1. Acted as a technical adviser on the construction site for subcontractors, crafts people and operatives.
2. Managed construction schedules related to electrical installation on site.
3. Prepared technical reports as required and resolved any unexpected technical difficulty and other problems.
Management Trainee Electrical
1. Worked with senior managers to plan and direct the work of the company.
2. Joined different departments to gain perspective, including power generation, electrical and instrumentation, and sales & procurement departments.
3. Prepared presentation reports as required throughout the training period.
Education
M.S Electrical Engineering
I have recently completed M.S Electrical Engineering from FAST-NU Lahore in December 2018 with a CGPA 3.02 out of 4. In this degree, I have worked on the thesis “Carbon Emission Reality and Carbon Capture Potential of Pakistan”. In this research work, I have estimated the carbon dioxide emissions from different fossil fuel-based power plants in Pakistan.
B.Sc. Electrical Engineering
I completed B.Sc Electrical Engineering from UET Lahore in September 2011 with a CGPA 3.08 out of 4. In this degree, I worked on a final year project, “Computer Aided Design of Single Phase Induction Motor”. In this project, I with my other group mates designed an efficient model of "Single Phase Induction Motor" with an overall efficiency of 65%.